Download this document as a JupyterLab notebook here

CE 3354 Engineering Hydrology
Fall 2022 Exercise Set 9

LAST NAME, FIRST NAME

R00000000


Purpose :

Estimate timing ($T_C$) parameters for a Hardin Creek Project sub-watersheds.

Assessment Criteria :

Completion, plausible solutions, use of Jupyter Notebook as a calculator/documentation method


Exercise 1:

Estimate the time of concentration using the Kerby-Kirpich for the Harden Creek watersheds (each sub-basin to reservoir riser pipe, and the portion downstream of the reservoirs directly to the study point of interest).

Exercise 2:

Estimate the time of concentration using the NRCS-Upland for the Harden Creek watersheds (each sub-basin to reservoir riser pipe, and the portion downstream of the reservoirs directly to the study point of interest).

Exercise 3:

Summarizr your findings in a table and save it for the project report.

Kerby-Kirpich Method Estimates

Sub-Basin Area (sq. mi.) Time of Concentration (minutes)
North Basin 987 123
West Basin 654 456
Eden Basin 321 789

NRCS Upland Method Estimates

Sub-Basin Area (sq. mi.) Time of Concentration (minutes)
North Basin 987 123
West Basin 654 456
Eden Basin 321 789
In [ ]: